Logo
     August 2020
Customer ClassConsumptionDemandLoad(Aug. 13, 2020 to
  (kWh)(kW)FactorSept. 12,2020)
Schedule I-FZStreetlights12,521  9.45
Schedule II-RResidential200  10.97
Schedule III-PGeneral Service572  11.63
Schedule IV-PGeneral Power5,353  10.02
Schedule V-PBulk Power 36,50010050%9.41
Schedule V-W
Bulk Power-Wheeling  36,500100 50%3.55
Schedule VI-PWholesale Power273,75075050%8.42
Schedule VI-WWholesale Power-Wheeling
273,750750 50%2.56
Schedule VII-PSpecial Wholesale876,0002,00060%7.76
Schedule VII-W
Special Wholesale-Wheeling
876,0002,000  60%1.90
      
Note:     
1.) Average rate was derived using the 0.75% Local Franchise Tax (LFT) of Cebu City.
2.) For the billing period, August 13, 2020 to September 12, 2020, NPC-PSALM Adjustment of Php 0.3515 per kWh or Php 0.1265 per watt for Schedule I and its corresponding VAT of 2.3449% will be implemented.
3.) Using the typical consumption of each customer class, except for schedules V, VI & VII.
4.) Schedules V & VI are simulated using a load factor of 50% and 60% for Schedule VII. Rates will vary depending on their load factor