April 5, 2025 ( Saturday)

Time:

9:00 AM to 5:00 PM (8hrs) CANCELLED

Purpose:

To improve the reliability of the distribution system serving Brgy. Lawaan I, Lawaan II, Lawaan III, Linao & Maghaway by facilitating installation of distribution transformer and installation of primary pole.

Areas Affected:

Portion of Talisay City (Lawaan I, Lawaan II, Lawaan III, Linao & Maghaway) along Cebu South Road, including San Jose Maria Village, Lessandra Roma Subdivision, Azienda Firenze Subdivision, Don Bosco Seminary, Communities Cebu Inc., Liloan Light-Year Lumber Corp., DPWH 2nd Engg. District, Cebu Blue Mountain Financing Corp. and Azienda Homeowner's Association Inc.

Time:

9:00 AM to 10:00 AM (1hr) CANCELLED

Purpose:

To facilitate cutting of loops for isolation of the working area.

Areas Affected:

Portion of Talisay City (Lawaan I , Lawaan II , Lawaan III , Linao & Maghaway) along portion of Maghaway Road, including portions of Sitios Antipolo , Babao , Bulahan , Cadicay , Calachuchi , Camemeng , Daku , Dequiam , Didos , Dikiam , Hagdanan , Kamagayan , Lawis , Lower , Nursery Proper , Pagtambayayong , Pajo , Romblon , Rose Ville , San Antonio , San Miguel , Upper, & Upper Cadicay, and Alpha Executive Subdivision , Azienda Firenze Subdivision , Camella Homes , Casa Mira Subdivision , Countryside Homes , Eleccion Compound , Jose Maria Village , Raphael Homes , Seaview Height , Seaview Heights , St Arnold Janssen Village , St. Mary Heights , The Heights Subdivision, & Tierra Grande Subdivision.

Time:

4:00 PM to 5:00 PM (1hr) CANCELLED

Purpose:

To facilitate installation of loops for energization of working area.

Areas Affected:

Portion of Talisay City (Lawaan I, Lawaan II, Lawaan III, Linao & Maghaway) along portion of Maghaway Road, including portions of Sitios Antipolo, Babao, Bulahan, Cadicay, Calachuchi, Camemeng, Daku, Dequiam, Didos, Dikiam, Hagdanan, Kamagayan, Lawis, Lower, Nursery Proper, Pagtambayayong, Pajo, Romblon, Rose Ville, San Antonio, San Miguel, Upper & Upper Cadicay, and Alpha Executive Subdivision, Azienda Firenze Subdivision, Camella Homes, Casa Mira Subdivision, Countryside Homes, Eleccion Compound, Jose Maria Village, Raphael Homes, Seaview Height, Seaview Heights, St. Arnold Janssen Village, St. Mary Heights, The Heights Subdivision & Tierra Grande Subdivision.


Time:

9:00 AM to 5:00 PM (8hrs)

Purpose:

To increase the capacity of the distribution system serving Brgy. Basak San Nicolas & Mambaling by facilitating upgrading of distribution transformers.

Areas Affected:

Portion of Cebu City (Basak San Nicolas & Mambaling) along Rizal Ave. Ext., Tabada St. including Col C Yap's Apt., Hawkeye Streetlight, Hawkeye Check Meter.

Time:

9:00 AM to 3:00 PM (6hrs)

Purpose:

To increase the capacity of the distribution system serving Brgy. Pulangbato by facilitating installation of distribution transformers.

Areas Affected:

Portion of Cebu City (Pulangbato) along Brgy. Pulangbato Rd. including portions of Sitio Dita, La Bellezah Subd., Pulangbato Health Center & MYVAN Properties and Development Inc.


Time:

10:00 PM to 11:00 PM (1hr)

Purpose:

To facilitate cutting of loops for isolation of working area.

Areas Affected:

Portion of Cebu City (Camputhaw, Carreta, Lorega-San Miguel & Tejero) along M.J. Cuenco Ave., General Maxilom Ext., Gorordo Ave., Gen. Echavez St., Mango Ave., Ayala Access Road including portions of Purok 6 Macroville, Sitio Tierra Curra, Malinao, Sambag, Laray, Ponce 2, Laurente, Bagong Buhay, Agay-ay, Caimito, Ponce Compound, Sto. Nino Subd., Carreta Barangay Hall, San Roque Chapel, Star Paper Corporation, Taipan Dev'T Inc., Vicente Sotto Memorial Medical Center, E.C. Daughson Inc., Bagong Buhay Elem. Sch., Diadem Terminal Maritime Services & Realty Inc., Sta. Teresita Chapel, Mother Of Perpetual Help Chapel, Medalla Milagrosa Chapel Tm, Tiera Cura Chapel, Carreta Sports Complex, Lite Shipping Corp., Filway Corp, Freemont Foods Corp., Jesa Management Corp., Dito Telecommunity Corporation, Pnp-Traffic Mgmt. Group (Tmg), Up Trend Realty Development Corporation, Protect Marine Deck And Engine Officers Of The Phils  Inc., Philippine Savings Bank, Alfonso & Sons Development Corp., Terred'Or Realty Corp., Patrocinio De Maria Realty And Dev'T Corp. M1, Freemont Foods Corporation, Unity Digital Infrastructure Inc., Asilo Milagrosa Church, Pnp Regional Hospital Recom 7, Asian Marine Transport Corp, Canpelaez Ventures Inc. M3, Southland Maclin Inernational, Inc., Bluspur Development Corporation, Solidbank Corporation M2, Jesa Management Corp. M8, Southland Maclin International, Inc. -M7, Innove Communications Inc. Ce-706, Uniwide Prime Ventures Corporation, Up-Trend Realty Development Corporation, Cebu City Police Office, Msy Holdings Corp., Scepter Enterprises, Pwl Prestige Warehousing And Logistics Inc., Up Trend Realty Development Corp., Cola,Azucena Pump, Limchua Thomas S Pump, Asia United Bank, Gallardo Felisa -Office, Enrison Holdings, Inc., Southland Maclin International, Inc. - M8, Canpelaez Ventures Inc. M1 Vinicio R (M-1), Go Peter Pump, Rafael Yu Realty Corp, Contesa Realty And Development Corporation, Canpelaez Ventures Inc. M4, Bluspur Development Corp., Cebu Jsp Mango Realty Dev. Corp., Metrobank - Mango, Taft Property Venture Development Corp., United Coconut Planters Bank, Aa And Sons Development Corp., Pilipinas Shell Petroleum Corporation.

Time:

8:00 AM to 5:00 PM (9hrs)

Purpose:

To improve the reliability of the distribution system serving Brgy. Mayana , Tagjaguimit & Alpaco by facilitating primary line upgrading.

Areas Affected:

Portion of City of Naga (Mayana , Tagjaguimit & Alpaco) including portions of Sitios Argonex, Asyang, Banaba, Cambahi, Cueva, Danawan, Huybesan, Ilaya, Mangga, Nangka, Tabu-Ag, Cacao, Camansiles, as well as Brgy. Alpaco Water System, Mayana Elem School, Cebu Sherlin Poultry Farms Corp., Mayana Covered Court, Tagjaguimit Elementary School, St. Phocas Organic Farm, and Tagjaguimit Barangay Hall.

April 5-6, 2025 (Saturday-Sunday)

Time:

10:00 PM of April 5 to 6:00 AM of April 6 (8hrs)

Purpose:

To improve the reliability of the distribution system serving Brgy. Carreta , Lorega-San Miguel & Tejero by facilitating reconstruction of primary lines.

Areas Affected:

Portion of Cebu City (Carreta , Lorega-San Miguel & Tejero) along MJ. Cuenco Ave., Gen. Maxilom Ave., & San Miguel St., including portion of Sitio Mardes, Laray, San Roque, San Miguel Caimito, Cardoc Inc., Ales Stewart Intercorp Inspection Phil Inc., Above the line Productions, Lifestyle Wellness Cebu Inc., Seair Inc., Cebu Skin Clinic, EB Aznar Management Services Corp., Interior Crafts of the Islands Inc., Carreta Substation Metering, Alcordo Advertising,  Insular life Assurance Co., League One Finance And Leasing Corp., L Wood Memorial, Department of Social Welfare and Development, PLDT Inc., Pro Builders Inc., Veco Carreta Guardhouse, City of Cebu Traffic Lights, Central Board of Assesment Appeals, First Aceplus Corporation, Sacred Heart School for Boys, Steel Art Billboard Inc., Veco Lorega, Maritech Maritime Training, Studies and Manning Services, Southwest Finance Corporation, All Flag Logistics Inc., Interior Crafts Of The Islands Inc., Maxsaver Trading Cebu Branch, Precision Machinist Corp, Fuente Triangle Realty Development Corporation, Pawncare Services Inc., Children Of Asia, Carreta Barangay Outpost, Lite Shipping Corp., Wellmade Motors And Development Corporation & Celebes Agricultural Corp.


April 6, 2025 (Sunday)

Time:

9:00 AM to 5:00 PM (8hrs)

Purpose:

To prevent unnecessary interruptions due to obstruction of pole in the distribution system serving Brgy. Pahina San Nicolas & San Nicolas Proper by facilitating relocation of primary pole as per customer request.

Areas Affected:

Portion of Cebu City (Pahina San Nicolas & San Nicolas Proper) along Lakandula St., B. Aranas St. & P. Sanchez St., including portion of Sitio Champaca Lakandula, Taboan Public Market, United Vendors Of Taboan Market and Taboan Market Office.

Time:

5:00 AM to 6:00 AM (1hr)

Purpose:

To facilitate installation of loops for energization of working area.

Areas Affected:

Portion of Cebu City (Camputhaw , Carreta , Lorega-San Miguel & Tejero) along M.J. Cuenco Ave., General Maxilom Ext., Gorordo Ave., Gen. Echavez St., Mango Ave., Ayala Access Road including portions of Purok 6 Macroville, Sitio Tierra Curra, Malinao, Sambag, Laray, Ponce 2, Laurente, Bagong Buhay, Agay-ay, Caimito, Ponce Compound, Sto. Nino Subd., Carreta Barangay Hall, San Roque Chapel, Star Paper Corporation, Taipan Dev'T Inc., Vicente Sotto Memorial Medical Center, E.C. Daughson Inc., Bagong Buhay Elem. Sch., Diadem Terminal Maritime Services & Realty Inc., Sta. Teresita Chapel, Mother Of Perpetual Help Chapel, Medalla Milagrosa Chapel Tm, Tiera Cura Chapel, Carreta Sports Complex, Lite Shipping Corp., Filway Corp, Freemont Foods Corp., Jesa Management Corp., Dito Telecommunity Corporation, Pnp-Traffic Mgmt. Group (Tmg), Up Trend Realty Development Corporation, Protect Marine Deck And Engine Officers Of The Phils  Inc., Philippine Savings Bank, Alfonso & Sons Development Corp., Terred'Or Realty Corp., Patrocinio De Maria Realty And Dev'T Corp. M1, Freemont Foods Corporation, Unity Digital Infrastructure Inc., Asilo Milagrosa Church, Pnp Regional Hospital Recom 7, Asian Marine Transport Corp, Canpelaez Ventures Inc. M3, Southland Maclin Inernational, Inc., Bluspur Development Corporation, Solidbank Corporation M2, Jesa Management Corp. M8, Southland Maclin International, Inc. -M7, Innove Communications Inc. Ce-706, Uniwide Prime Ventures Corporation, Up-Trend Realty Development Corporation, Cebu City Police Office, Msy Holdings Corp., Scepter Enterprises, Pwl Prestige Warehousing And Logistics Inc., Up Trend Realty Development Corp., Cola,Azucena Pump, Limchua Thomas S Pump, Asia United Bank, Gallardo Felisa -Office, Enrison Holdings, Inc., Southland Maclin International, Inc. - M8, Canpelaez Ventures Inc. M1 Vinicio R (M-1), Go Peter Pump, Rafael Yu Realty Corp, Contesa Realty And Development Corporation, Canpelaez Ventures Inc. M4, Bluspur Development Corp., Cebu Jsp Mango Realty Dev. Corp., Metrobank - Mango, Taft Property Venture Development Corp., United Coconut Planters Bank, Aa And Sons Development Corp., Pilipinas Shell Petroleum Corporation.


April 7-8, 2025 (Monday-Tuesday)

Time:

10:00 PM of April 7 to 12:00 AM of April 8 (2hrs)

Purpose:

To facilitate cutting of loops for isolation of working area.

Areas Affected:

Portion of Mandaue City (Maguikay & Bakilid) along portion of M.C. Briones Street, including portion of Sitio Lupa, as well as Teamspirit Sales Corp., St. Paul College Foundation Inc., Maribago Developers Corp., Ramcar Incorporated, Jayme Graciano Auto Shop, Everest Cooling Corp., H&E Industries Inc., Sastre de Cebu Inc, Zimmer Holding Inc, Sozo Industries Corp, Maguindanao Appliance, Jollibee Food Corp, Hafele Philippines Inc, Bank of the Philippine Islands, Mandaue 3N Parts and Supply, All Fresh Food Product Inc, Savemore, City Government of Mandaue, Alcordo International Inc, Prime Billboards, Sabina Marketing, Narra Wealth, Lucky Tableware Factory Inc, Globe Telecom Inc, Funitech Services and Sales Inc, Mandaue Supermart Corp, General Santos New Castle Dev't Inc, VG Lava Warehouse, DITO Telecommunity Corporation, Profoods Int'l Corp, Leciann Ventures Inc, Mercury Drugs Corp, Phil. Bank of Communications, Sun-ace trade and Commodities Inc, Cebu Belmont Inc, Vel-Ouano Realty Inc, and Lumapas Compound.


Time:

10:00 PM of April 7 to 6:00 AM of April 8 (8hrs)

Purpose:

To prevent unnecessary interruptions due to obstruction of pole in the distribution system serving Brgy. Maguikay by facilitating relocation of primary pole as per customer request.

Areas Affected:

Portion of Mandaue City (Maguikay) along M.C. Briones Street, including portion of Sitio Lupa, as well as Ramcar Inc, H&E Industries Inc, Sozo Industries Corp, Globe Telecom Inc, Profoods Int'l Corp, Daxkin International, Leciann Ventures Inc, Sun-ace Trade and Commodities Inc, Cebu Belmont Inc, and Profood Compound.

April 8, 2025 (Tuesday)

Time:

10:00 PM to 11:00 PM (1hr) CANCELLED

Purpose:

To facilitate cutting of loops for isolation of working area.

Areas Affected:

Portion of Cebu City & Mandaue City (Bacayan , Canduman , Talamban & Tawason) along Gov. M. Cuenco Ave. & H. Abellana St., including Pristina North Subd., Lauan Dr. Mahogany Groove Subd., Academia De San Isidro Labrador Campesino, Inc., San Isidro Parish School, Mary Immaculates Learning Center, and The Parish Priest - Talamban Parish.

Time:

9:00 AM to 5:00 PM (8hrs)

Purpose:

To improve the reliability of the distribution system serving Brgy. Babag by facilitating installation of primary pole.

Areas Affected:

Portion of Cebu City (Babag) including portions of Sitio Liko-liko, Pili, Progressive Broadcasting Corp.


Time:

9:00 AM to 1:00 PM (4hrs)

Purpose:

To improve the reliability of the distribution system serving Brgy. Tilhaong by facilitating tapping of service entrance wire.

Areas Affected:

Portion of Consolacion (Tilhaong) including portions of Sitio Tambis, Apao Village, Consolacion Water Systems,Inc.


Time:

9:00 AM to 5:00 PM (8hrs)

Purpose:

To improve the reliability of the distribution system serving Brgy. Sirao by facilitating replacement of primary pole.

Areas Affected:

Portion of Cebu City (Sirao) along F. Gochan St. including portions of Sitio Proper, Tawagan, Langub, Kang-irag, Cambio-os.

Time:

9:00 AM to 5:00 PM (8hrs)

Purpose:

To improve the reliability of the distribution system serving Brgy. Guadalupe by facilitating installation of primary pole.

Areas Affected:

Portion of Cebu City (Guadalupe) along Banawa near Gochan Subd. road to Elementary School, Modesta St., Don Gervacio St., Quijada St., Cabajar St., Road to Monterrasas Subd. including portions of Sitio Mahayahay, Kamanggahan, Kalubihan, Sampaguita, Banika, Monterrasas Subd., White Hills Subd., San Jose Hills, North 8 Subd., Hillside Subd., Northridge Residences, Zafra Compound, Fatima Hills, Monterrasas de Cebu, Streetlights Monterrasas de Cebu, Genvi Development Corp, Phil-Tower Consortium Inc., Parents Reach Foundation-Reach Learning Center Inc., Skyestates Construction Corporation, Dito Telecommunity Inc., The Mont Property Group Inc., Sc Prestige Multi Ventures Inc., Cript Transport Inc., Espina,Perez-Espina Realty Corp., Zafra Eleno Pump, Sky Estates Construction Corporation, Tgm Prime Estate Leasing & Dev'T Corp.


Time:

9:00 AM to 5:00 PM (8hrs)

Purpose:

To improve the reliability of the distribution system serving Brgy. Linao & Lipata by facilitating tapping of service entrance wire.

Areas Affected:

Portion of Minglanilla (Linao & Lipata) including portion along San Roque St., Lipata Central School and Lipata Elem. School.

Time:

9:00 AM to 5:00 PM (8hrs)

Purpose:

To increase the capacity of the distribution system serving Brgy. Basak San Nicolas by facilitating upgrading of distribution transformer.

Areas Affected:

Portion of Cebu City (Basak San Nicolas) along Bontores St., Lemon St. including portion of Sitio Redrads, Brotherhood, Hawkeye Check Meter, Hawkeye Streetlight.

Time:

5:00 AM to 6:00 AM (1hr)

Purpose:

To facilitate installation of loops for energization of working area.

Areas Affected:

Portion of Mandaue City (Maguikay & Bakilid) along portion of M.C. Briones Street, including portion of Sitio Lupa, as well as Teamspirit Sales Corp., St. Paul College Foundation Inc., Maribago Developers Corp., Ramcar Incorporated, Jayme Graciano Auto Shop, Everest Cooling Corp., H&E Industries Inc., Sastre de Cebu Inc, Zimmer Holding Inc, Sozo Industries Corp, Maguindanao Appliance, Jollibee Food Corp, Hafele Philippines Inc, Bank of the Philippine Islands, Mandaue 3N Parts and Supply, All Fresh Food Product Inc, Savemore, City Government of Mandaue, Alcordo International Inc, Prime Billboards, Sabina Marketing, Narra Wealth, Lucky Tableware Factory Inc, Globe Telecom Inc, Funitech Services and Sales Inc, Mandaue Supermart Corp, General Santos New Castle Dev't Inc, VG Lava Warehouse, DITO Telecommunity Corporation, Profoods Int'l Corp, Leciann Ventures Inc, Mercury Drugs Corp, Phil. Bank of Communications, Sun-ace trade and Commodities Inc, Cebu Belmont Inc, Vel-Ouano Realty Inc, and Lumapas Compound.

April 8-9, 2025 (Tuesday-Wednesday)

Time:

10:00 PM of April 8 to 5:00 AM of April 9 (7hrs) CANCELLED

Purpose:

To improve the reliability of the distribution system serving Brgy. Canduman by facilitating installation of automatic reclosing device (recloser).

Areas Affected:

Portion of Mandaue City (Canduman) along H. Abellana St., including portion of Sitio Zone 5, San Rose Market, Canduman Chapel and Rulls Home Bakeshop, Inc.

April 9, 2025 (Wednesday)

Time:

4:00 AM to 5:00 AM (1hr) CANCELLED

Purpose:

To facilitate installation of loops for energization of working area.

Areas Affected:

Portion of Cebu City & Mandaue City (Bacayan , Canduman , Talamban & Tawason) along Gov. M. Cuenco Ave. & H. Abellana St., including Pristina North Subd., Lauan Dr. Mahogany Groove Subd., Academia De San Isidro Labrador Campesino, Inc., San Isidro Parish School, Mary Immaculates Learning Center, and The Parish Priest - Talamban Parish.

Time:

9:00 AM to 2:00 PM (5hrs)

Purpose:

To improve the reliability of the distribution system serving Brgy. Tayud by facilitating relocation of guy.

Areas Affected:

Portion of Consolacion (Tayud) along Pag-utlan Road including portions of Purok Sunflower, Sitio Pag-utlan, Rockwell Subd.

Time:

7:00 AM to 4:00 PM (9hrs)- CANCELLED

Purpose:

To improve the reliability of the distribution system serving Brgy. Tangke by facilitating installation of primary pole.

Areas Affected:

Portion of Talisay City (Tangke) along Cebu South Coastal Road, including Purok Lambay, as well as Cebu South Harbor and Container Terminal Corp., and Philippine Coast Guard.

Time:

4:00 AM to 4:00 PM (12hrs)

Purpose:

To improve the reliability of the distribution system serving Brgy. San Roque & San Isidro by facilitating 69kV Lines Stringing.

Areas Affected:

Portion of Talisay City (San Roque & San Isidro) along Cebu South Coastal Road, V.H. Garces Street, Washington Street,

including portions of Sitios Zone 3, Zone 4, Ilang-ilang, Kasagingan, Ughai, Plangganahan, Laray, Purok  Sambag, Santan,  Atis, Laray, as well as Fairlane Automotive Ventures Inc., Auto Global Inc, Talisay City Traffic Lights, PTT Philippines, Corp., DITO Telecom Corp., Talisay Metal Merchandising Inc., CMVCU Corporation, Philippine Long Distance Tel., Likrosp Japan Trade Center Inc., Globe Telecom Inc., Sacred Homes Subdivision, Corazon Village, Coastal View Subdivision, Fortune Plain Village, and Kimba Sacred Homes.


Time:

9:00 AM to 5:00 PM (8hrs)

Purpose:

To improve the reliability of the distribution system serving Brgy. Tingub by facilitating installation of primary pole.

Areas Affected:

Portion of Mandaue City (Tingub) along M. Ceniza St. including portions of Purok 2 Matinabangun, Sitio Panaghiusa, Prestige Modular And Wood Concept Inc.

April 10, 2025 (Thursday)

Time:

9:00 AM to 4:00 PM (7hrs)

Purpose:

To increase the capacity of the distribution system serving Brgy. Basak Pardo by facilitating upgrading of distribution transformer.

Areas Affected:

Portion of Cebu City (Basak Pardo) along L. Gabuya Street and Rizal Avenue Extension, including portions of Sitio Fatima and Tagunol.

Time:

9:00 AM to 5:00 PM (8hrs)

Purpose:

To increase the capacity of the distribution system serving Brgy. Pooc by facilitating upgrading of distribution transformer.

Areas Affected:

Portion of Talisay City (Pooc) along portions of Sitio Tambis, Cabutoy, Cainta, Maharlika, Corona del Mar Subd., Corona Del Mar Homeowners Association Inc., Thermoco Building Blocks Corporation, Filinvest Land Inc., Pacific Catv Incorporated, Cebu Rich Development And Realty Corp.

April 10-11, 2025 (Thursday-Friday)

Time:

10:00 PM of April 10 to 6:00 AM of April 11 (8hrs)

Purpose:

To improve the reliability of the distribution system serving Brgy. Sambag I by facilitating reconstruction of primary lines.

Areas Affected:

Portion of Cebu City (Sambag I) along P. del Rosario Ext., N Bacalso St., J. Alcantara St., Rizal Ave. including portions of Sitio San Jose, San Roque, Laguna, Balangkapuna, Urassi, Arriola Subd., Amor Garona Building, College Of Technological Science-Cebu, Rizwoods Colleges, Aspac Rural Bank Inc., Cebu Aluminum Center-M4, Globe Telecom Inc., Land Transportation Office, Sta. Cruz Chapel, Bonne Realty  Corporation, Office Of Civil Defense Ro Vii, F1Rst Energy Corp, College Of Technological Sciences-Cebu, Inc., Kepco Spc Power Corporation, Elizabeth Mall.

April 11, 2025 (Friday)

Time:

9:00 AM to 5:00 PM (8hrs)

Purpose:

To prevent unnecessary interruptions due to obstruction of pole in the distribution system serving Brgy. Labangon & Tisa by facilitating relocation of primary pole as per customer request.

Areas Affected:

Portion of Cebu City (Labangon & Tisa) along R. Arcenas St., including portions of Sitio Sidlakan, Kadasig, Kalumboyan, Sta. Ana, Upper Sta. Ana, Capaculan, Kalumboyan, Kasagingan, Mangga, Caimito, San Isidro Labrador, as well as, Handumanan Development Corporation, JGY Land Corporation, TJJP Realty & Development Corporation, GM 23 Prime Management, Inc., Cebuano Waters Inc., Kadaisg Community Inc., South Pole Land Development Corp., Danaque Properties Inc., Casa Rosita Subdivision Tisa, Paseo San Ramon Subdivision, Ridges Subd., and South Gate Residences.

April 11-12, 2025 (Friday-Saturday)

Time:

10:00 PM of April 11 to 6:00 AM of April 12 (8hrs)

Purpose:

To increase the capacity of the distribution system serving Brgy. Carreta & Lorega-San Miguel by facilitating extension of primary lines (line stringing).

Areas Affected:

Portion of Cebu City (Carreta & Lorega-San Miguel) along M.J. Cuenco Ave., San Miguel St., General Maxilom Ext., Central Nautical Hiway including portions of Sitio Laray, Agay-ay, Pepang, Caimito, as well as Cardoc Inc., Alcordo Advertising, Alex Stewart Intercorp Inspection Phil., Above the Line Productions, Lifestyle Wellness Cebu Inc., Seair Inc., Cebu Skin Clinic, E.B. Aznar Management Services Corp., Interior Crafts of the Islands Inc., Vicente Sotto Memorial Medical Center, Innove Comm. Inc., League One Finance and Leasing Corp., L Wood Memorial, Department of Social Welfare and Development, PLDT Inc., Cebu Metropolitan Cathedral, Central Board of Assessment Appeals, First Aceplus Corporation, Sacred Heart SCH for Boys, Steel Art Billboard Inc., Maritech Maritime Training Studies and Manning Services, Southwest Finance Corporation, All Flag Logistics Inc., Maxsaver Trading Cebu Branch, Celebes Agricultural Corp.,  Smart Communications Inc., Sta. Teresita Chapel, Mother of Perpetual Help Chapel, Nicris Dev. Corp., Carreta Barangay Outpost, Children of Asia, and Rough Riders Compound.